Civil Engineering
Arcelor Mittal, Duisburg
Construction of a railway bridge
Bad Kreuznach, An der Lindenmühle
Expansion flood pump station sewage treatment plant
Bonn, Dreholzstraße
Dreholzstrasse sewer renovation
Cologne INEOS
Replacement of underground sections of the LDF ship unloading pipeline
Cologne-Sürth, Lindemauer
Renovation of flood defence wall
Engelskirchen
Construction of the new mechanical treatment stage at the Bickenbach wastewater treatment plant
Essen
“Wolfsbachtal Sammler” collector in the nature reserve
Esslingen am Neckar
Hanns-Martin-Schleyer bridge culvert, full cut driving under compressed air, civil engineering and foundation construction (drill-foundation piles)
Frankenberg
Railway crossing at Berleburgerstraße
Gau-Bickelheim
New cold store for Sutter
Gau-Bickelheim, Sutter plant II
Earthworks for the new plant II and construction of a sewage treatment plant
Hasenstraße in Oberhausen
Construction of a new stormwater retention tank and sewer reconstruction
Heidelberg
Sewer jacking Newtonstraße Ost
Heiligkreuzsteinach
New construction of elevated tank Steinwaldquelle
Herdorf
Renovation of wastewater treatment plant - stormwater overflow basin, primary clarifier, process water basin and screen building
Langen, Teichstraße
Construction of a new stormwater retention tank
Mutterstadt
Extension of Blockfeld stormwater retention tank
Neuss RKB
Construction of a new storage sewer with rainwater clarifier
Neuwied-Engers
Reinforcement of the Rhine dyke
Oberhausen, Hessenstraße
Separation of wastewater and river water
Offenbach
Production of stairs
Sinzig-Bad Bodendorf
New construction railway bridge
Starkenburger Straße in Riedstadt-Goddelau
Full road expansion of Starkenburger Straße
Thörlingen
Baybachtal wastewater treatment plant, lot 1 stormwater overflow basin
Wiesbaden-Erbenheim
New construction of Ländchesbahn bridge
























