Direct Pipe® is a combination of the microtunnelling process and the HDD method and was first applied worldwide by SONNTAG. A completely prefabricated steel pipe is laid out behind the pipe press, the so-called Pipe Thruster, over the entire thrust length.
The steel pipe welded to a conventional microtunnelling machine is encompassed by the clamping unit of the Pipe Thruster and pushed into the ground towards the target pit. The supply and disposal lines necessary for the operation of the microtunnelling machine are installed in advance in the prefabricated steel pipe. The proven gyroscope compass system in combination with an electronic hose level ensures precise reaching of the target construction pit.