Hanau, Goodyear Dunlop Tires
Crossing of the track apron at Hanau main station between Daimlerstrasse and Rodgaustrasse with closed pipe jacking DN 1600
-
Client
-
Hanau Netz GmbH
-
Services
-
270 m RC-TF pipe DN 1600; 2 shaft structures in bored pile shoring; insertion of 21 DN 180 & 225 empty pipes into the tunnel; extensive measures for securing and monitoring the track position during jacking work
-
Geology
-
Sand / gravel
-
Special features
-
Groundwater, inner-city construction project with high traffic volume; railway pressure (crossing of 38 tracks and 2 points); extensive empty pipe installation
You might also be interested in