- Client
- Municipal utilities Riedstadt
- Services
- 1,600 cbm excavation, 150 cbm reinforced concrete, 183 cbm underwater construction, 2 floors (7 x 5.35 x 6.50 / 7 x 3.60 x 2.80) and collection shaft (5 x 1.70 x 6.50 m) in cast-in-place concrete construction, 94 t sheet pile wall, technical building equipment incl. wastewater pumps
- Special features
-
New construction while operating the old pumping station, high groundwater levels


