Erpolzheim

Flood protection and development of floodplains in the Dürkheim and Erpolzheim quarries

Client
Gewässerzweckverband Isenach-Eckbach in Lambsheim
Services
80 m RC jacking pipes DN 1200 / DA 1540, 2 brackets
Geology
Silt, fill, sand
Special features
Crossing of the railway tracks on an embankment; above-ground pits with steel abutments on the access side; 16,000 m² of construction road; 36,500 m³ of topsoil removed 

More references