- Client
- Environmental and service company Zweibrücken
- Services
- 29.20 m GGG pipe DN 300/DN 500; 8 m pressure line PE 100; 9 m SB pipe DN 700; 2 prefabricated concrete works; 1 SB prefabricated shaft DN 1200; 90 sqm shoring boxes and chamber slab shoring; Equipment for SB prefabricated structures with throttle and curtain wall as well as technical equipment
- Special features


