Renovation of transport canal, Anrath first construction stage
- Client
- Niersverband
- Scope of services
- 2 prefabricated cleaning shafts; 480 m³ excavated soil; 45 m pipe jacking DN 1400 / DA 1960; 289 m pipe jacking DN 600 / DA 860; 106 pcs. Drill-foundation piles, d = 0.90 m
- Geology
- Sand, gravel ans silt
- Special feature
- Drill-foundation piles in the immediate vicinity of the Niers and a high-pressure gas pipeline; pipe jacking work with a curve diameter R = 300 m for DN 600; all work in the nature conservation area