What are you searching for?

Hanau, Goodyear Dunlop Tires

Crossing of the track apron at Hanau main station between Daimlerstrasse and Rodgaustrasse with closed pipe jacking DN 1600

Client
Hanau Netz GmbH
Scope of services
270 m RC-TF pipe DN 1600; 2 shaft structures in bored pile shoring; insertion of 21 DN 180 & 225 empty pipes into the tunnel; extensive measures for securing and monitoring the track position during jacking work
Geology
Sand / gravel
Special feature
Groundwater, inner-city construction project with high traffic volume; railway pressure (crossing of 38 tracks and 2 points); extensive empty pipe installation
Back to overview
backOverview