Renovation of rainwater treatment systems in Herne and Gelsenkirchen
- Client
- Emschergenossenschaft / Lippeverband
- Scope of services
- Pressing 123 m RC jacking pipes DN 500; pressing 99 m RC jacking pipes DN 2000
- Geology
- Sand, gravel and silt
- Special feature
- Partial execution of the construction work in the area of the Emscher river; minimum covering for pipe jacking DN 2000 of 1.00 m in the area of the launch pit (stormwater overflow); 2 jacking supports DN 500 with a height offset of approx. 8.00 m to the stormwater overflow basin and the existing pumping station
Back to overview
backOverview