Our Know-How | Pipe jacking - Pilot drive

Our Know-How Pilot drive ND 150 - ND 400
Rohrvortrieb Pilotrohrvortrieb DN 150 - DN 400

Pilot drive ND 150 - DN 400

„Building for people and nature“ - no empty words for SONNTAG. Subterranean driving reduces the adverse effects which arise from a project and save resources. Therefore, we intend to install collectors and house service connections trenchless, as often as possible.

In this area we work with the “pilot drive”. In ground which can be displaced, we press a pilot pipe to the target groove under permanent optical control of bearing and inclination. The pilot pipe is used as orientation for the really driving and lying of the adapter pipes. Compared to the open laying of pipes the construction period will be reduced considerably.