Year
|
Project locality
|
Client
|
Project
|
|
2012
|
Kall enlargement and new construction pluvial overflow buildung and rain storage reservoir
|
Special purpose association Eifel-Ruhr, Düren
|
200 m2 sheet pile wall 300 m2 spaced pilen curtain wall with shotcrete infill 19 bore piles with empty bores
|
|
2011-2013
|
Mönchengladbach barrage construction 206 Rönneter Feld-northpark
|
NVV Mönchengladbach
|
12 shotcrete pits Ø 5,50 m until 12,0 m, depth until 16 m pit : 35x17x18 m as timber wall with shotcrete infill 3100 m strand anchors
|
|
2011-2012
|
St. Goar, new building outskirts
|
Water and Shipping Authority Bingen
|
1200 m2 sheet pile wall, partly in the river Rhine 25 m bore piles Ø 90 cm 1000 m vibrated stone columns 700 m soil replacement drill holes Ø 90 cm
|
|
2011
|
Nassau / Singhofen - improved efficiency retaining structure BW 5612 5233
|
Office for Mobility, Diez
|
735 m site concrete bore piles Ø 88 cm depth: until 9 m
|
|
2010-2011
|
Coblenz, fish pass - Moselle barrage
|
Struktur- und Genehmigungsdirektion Nord
|
1500 m2 secant bored pile retaining wall Ø 90 cm and Ø 62 cm depth: 12 - 18 m 13 foundation piles Ø 90 cm 1000 m2 sheet pile wall 1150 m injection piles
|
|
2010-2012
|
HWS Lützel-Neuendorf - pumpstation, Part 4
|
City of Coblenz
|
1450 m2 bored pile wall Ø 1,20 m depth: 16 m
|
|
2010-2012
|
HWS Lützel-Neuendorf, Los 3
|
City of Coblenz
|
1450 m secant bored pile retaining wall (1985 single piles Ø 88 cm depth: until 18 m - 31740 bored meters)
|
|
2010
|
Münster
|
Wirtschaftsförderung Münster GmbH (economic promotion)
|
Bored piles Ø 90 cm, 48 units pit: R = 5,25 m depth: 20,50 m
|
|
2009-2010
|
Coblenz, new buildung of a railway-stop
|
City of D-Koblenz (BUGA 2011)
|
bored pile foundation work Ø 0,88 m, 24 units depth 8 - 10 m sheeting Ø 0,88 m, 32 units, depth 10 - 14 m - approx. 75 m length (4 m high)
|
|
2009-2010
|
Offenbach, connected sewer in Bieber, 2. Sec.
|
City of D-Offenbach/Main
|
Secant bored pile retaining wall: launch pit approx. 65 units á 11,45 m / depth: 10,00 m - Ø = 0,88 m, surface A = ellipse 12,00 x 15,50 m target pit: ca. 42 units. á 7,73 m / depth: 6,50 m - Ø = 0,88 m, surface A = ellipse 7,20 x 10,80 m
|
|
2009
|
Mayen
|
Firma Meurer, Oberfell
|
bored pile foundation work Ø 0,60 m, 6 units - depth: approx. 8,0 m
|
|
2009
|
Cologne-Kalk, Istanbulstreet
|
City of D-Cologne
|
deep foundation with bored piles Ø 0,88 m, 12 units., depth: 6,0 - 9,4 m
|
|
2009
|
Coblenz, "Rhine"-steps
|
City of D-Coblenz (BUGA 2011)
|
50 units foundation piles Ø 0,88 m, depth: 8,50 - 11,50 m ( partial from a pontoon)
|
|
2008-2010
|
Coblenz, "Konrad-Adenauer Ufer"
|
City of D-Coblenz (BUGA 2011)
|
bored pile retaining wall - 210 units, depth of the pile boreholes = 8 - 10 m, Ø = 0,88 m
|