Year
|
Project locality
|
Client
|
Project
|
|
2009-2010
|
Coblenz, new buildung of a railway-stop
|
City of D-Koblenz (BUGA 2011)
|
bored pile foundation work Ø 0,88 m, 24 units depth 8 - 10 m sheeting Ø 0,88 m, 32 units, depth 10 - 14 m - approx. 75 m length (4 m high)
|
|
2009-2010
|
Offenbach, connected sewer in Bieber, 2. Sec.
|
City of D-Offenbach/Main
|
Secant bored pile retaining wall: launch pit approx. 65 units á 11,45 m / depth: 10,00 m - Ø = 0,88 m, surface A = ellipse 12,00 x 15,50 m target pit: ca. 42 units. á 7,73 m / depth: 6,50 m - Ø = 0,88 m, surface A = ellipse 7,20 x 10,80 m
|
|
2009
|
Mayen
|
Firma Meurer, Oberfell
|
bored pile foundation work Ø 0,60 m, 6 units - depth: approx. 8,0 m
|
|
2009
|
Cologne-Kalk, Istanbulstreet
|
City of D-Cologne
|
deep foundation with bored piles Ø 0,88 m, 12 units., depth: 6,0 - 9,4 m
|
|
2009
|
Coblenz, "Rhine"-steps
|
City of D-Coblenz (BUGA 2011)
|
50 units foundation piles Ø 0,88 m, depth: 8,50 - 11,50 m ( partial from a pontoon)
|
|
2008-2010
|
Coblenz, "Konrad-Adenauer Ufer"
|
City of D-Coblenz (BUGA 2011)
|
bored pile retaining wall - 210 units, depth of the pile boreholes = 8 - 10 m, Ø = 0,88 m
|