Special underground construction
Year Project locality Client Project
2009-2010 Coblenz, new buildung of a railway-stop City of D-Koblenz (BUGA 2011) bored pile foundation work Ø 0,88 m, 24 units depth 8 - 10 m
sheeting Ø 0,88 m, 32 units, depth 10 - 14 m - approx. 75 m length (4 m high)
2009-2010
Fotos
Offenbach, connected sewer in Bieber, 2. Sec. City of D-Offenbach/Main Secant bored pile retaining wall: launch pit approx. 65 units á 11,45 m / depth: 10,00 m - Ø = 0,88 m, surface A = ellipse 12,00 x 15,50 m target pit: ca. 42 units. á 7,73 m / depth: 6,50 m - Ø = 0,88 m, surface A = ellipse 7,20 x 10,80 m
2009 Mayen Firma Meurer, Oberfell bored pile foundation work Ø 0,60 m, 6 units - depth: approx. 8,0 m
2009 Cologne-Kalk, Istanbulstreet City of D-Cologne deep foundation with bored piles Ø 0,88 m, 12 units., depth: 6,0 - 9,4 m
2009
Fotos
Coblenz, "Rhine"-steps City of D-Coblenz (BUGA 2011) 50 units foundation piles Ø 0,88 m, depth: 8,50 - 11,50 m ( partial from a pontoon)
2008-2010
Fotos
Coblenz, "Konrad-Adenauer Ufer" City of D-Coblenz (BUGA 2011) bored pile retaining wall - 210 units, depth of the pile boreholes = 8 - 10 m, Ø = 0,88 m