|
Year
|
Project locality
|
Client
|
Ca. meter
|
Material
|
|
2008
|
Alzenau
|
FWS
|
100 25
|
PE-HD ND 100 PE-pressure pipe
|
|
2007
|
Berlin-Pankow, Frankenstraße
|
"Berliner Wasserbetriebe" (reginal utilities)
|
125
36
|
GGG water pipe open construction method, ND 80- 300 GGG press and pull method, ND 100-150 GGG
|
|
2007
|
Berlin-Treptow- Köpenick, Aßmannstraße
|
"Berliner Wasserbetriebe" (reginal utilities)
|
16 48
23
|
ND 100 GGG waterpipe ND 600 steel-pipe - Swagelining - ND 500 PE-HD
|